Dredging Project Pictures
Below are pictures of the Clear Lake dredging project. Lake dredging began in July of 2008 and was completed in the fall of
2009. A total of 2.4 million cubic yards of sediment was removed from the lake bottom, increasing maximum lake depth from 6 ft to over 20 ft.
Dredge Barge on Clear Lake
Aearial Photo of Dredge Barge
Dredged Material Entering Containment Site (courtesy of
Globe Gazette)
|
Dredge Cutter Head
Dredged Material Containment Site
Water Being Returned to Clear Lake via Ventura Marsh
|